VAL Avionics NAV 2000 Installation Guide Page 270

  • Download
  • Add to my manuals
  • Print
  • Page
    / 401
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 269
Accessory Installation and Configuration
15-2 SkyView System Installation Guide - Revision R
Failure Warning
Designed to meet the indication requirements of FAR 23.1326, the heated pitot controller has
an output that can trigger a warning light in the cockpit whenever the probe heater is turned
off or is not functioning properly. While not required for Experimental and LSA category
aircraft, this feature provides peace of mind, giving you instant feedback that your probe’s
heater is working as designed.
Tools and Materials Required
Dynon Avionics AOA/Pitot Probe
Two plumbing lines (usually ¼” soft aluminum or plastic tubing) routed from the SV-
ADAHRS-200/201 to the probe mounting location
Tubing interface hardware
o Reference our wiki at http://wiki.dynonavionics.com for tubing interface hardware
recommendations.
#36 drill and #6-32 tap
AOA Pitot Mounting bracket. Models known to work well can be found at
http://wiki.dynonavionics.com/AOA_Pitot_Brackets_and_Parts.
Heater Controller Module Installation
This section addresses heater controller module installation. If you are installing the unheated
version of the probe, you may skip to the AOA/Pitot Probe Mounting Section.
Page view 269
1 2 ... 265 266 267 268 269 270 271 272 273 274 275 ... 400 401

Comments to this Manuals

No comments